Alarms
Audit and diagnostic
Communication interfaces
Configuration environment
Data acquisition
DataVue/Data Export
Development kits
General
Historical data
HMI
Known issues
Other Products
PcVue installation
PcVue miscellaneous
Real time data
Sample projects
Scripting
Security bulletin
SnapVue
System
TouchVue
UDC
Upgrade issues
Useful tools
Version Information
WebVue
[KB1274] PcVue 17 – Central Project Management Guide
Configure Central Project Management in PcVue 17 with the Host Deployment Console or the svcmd CLI.
[KB1273] Startup and connectivity failures after migrating a project to 17.0.0
When a project created with 15.2 or 16.3 is migrated to 17.0.0, the security configuration of the source project is not preserved: the stricter 17.0.0 defaults are applied instead. As a result, the migrated project may fail to start, lose connectivity between stations, or have protocols and security options blocked although they were operational before the upgrade. This behavior is corrected in 17.0.1. Until that version is available, apply the workaround described below.
[KB1272] PcVue 17 – Project Migration Guide
Migrating a PcVue project from older versions to version 17 requires an explicit migration step. Because PcVue 17 introduces a new cryptographic protection mechanism, a project created or last saved in the previous versions will not start on version 17 until it has been migrated. This guide explains why the migration is mandatory and walks you through both methods: the Host Deployment Console (graphical) and the ProjectUtility command-line interface.


